Project Requirements
Removing excavated soil from underground, transporting materials for building construction, and moving subway train bodies.
Project Challenge
The complex internal structures and overhead obstacles within the subway platforms,the crane is difficult to cover the entire construction area.
Solution
We installing a large gantry crane above the subway, with a width matching that of the station. The crane would be mounted on wheels and move horizontally along tracks laid on the ground. Vertical adjustments would be made using extended wire ropes on electric hoists, allowing for precise lifting operations at any location.
Chunhua Group is committed to solving various lifting challenges in different environments and specializes in customizing cranes for specific needs. If you have any questions about cranes, please feel free to contact us anytime!